Project
Date
Equipment
Technician
Location
Reviewed by

Pre-power

  • Confirm the drive model matches the intended supply and motor application
  • Confirm protective earth and bonding connections are complete
  • Confirm line, load, braking, and control terminals are landed intentionally
  • Confirm motor cable routing and shielding approach match the design basis
  • Confirm the driven machine is safe for initial motion checks

Setup

  • Record the motor nameplate data before parameter entry
  • Enter or verify the required motor and control parameters
  • Confirm the command source and stop behavior are understood

First power-up

  • Power the drive in a controlled state
  • Confirm no immediate faults or abnormal indications appear
  • Confirm the drive can be safely inhibited or disabled if behavior is unexpected

First run

  • Verify rotation direction using an approved low-risk test method
  • Observe current, sound, vibration, and temperature trend during the initial run
  • Stop and investigate immediately if abnormal behavior appears

Handover basis

  • Save or record key commissioning parameters
  • Record any tuning changes or restrictions for future maintenance

Follow site safety procedures and OEM instructions for stored energy, isolation, and enabled motion throughout.

Trust Boundary — Engineering Judgment Required

This site is a personal-use paraphrase and navigation reference for industrial automation standards. It is not a substitute for authoritative standards documents, professional engineering judgment, or legal review. All content is sourced from a local RAG corpus and has not been independently verified against current published editions.

Items marked TO VERIFY have limited or unconfirmed local coverage. Items marked NOT IN CORPUS are not covered in the local repository. Do not rely on this site for compliance determinations, safety-critical design decisions, or legal interpretation.