Available Scenarios

Scenario 01 US Industrial Control Panel

Start: UL 508A + NEC + NFPA 79

Open scenario →
Scenario 02 Global Machine (US + EU)

Start: NFPA 79 + IEC 60204-1 + ISO 12100

Open scenario →
Scenario 03 Process Skid Shutdown System

Start: IEC 61511 + IEC 61508

Open scenario →
Scenario 04 Networked Safety PLC Architecture

Start: ISO 13849-1 / IEC 62061 + IEC 62443

Open scenario →
Scenario 05 Semiconductor Equipment Compliance

Start: 15-Standard Minimum Compliance Stack

Open scenario →
Scenario 06 Practical Machine Safety Implementation

Start: ISO 13849-1 / IEC 62061 — 10-step SIL/PL workflow

Open scenario →
Scenario 07 O&G Onshore Process Skid (ESD / F&G)

Start: IEC 61511 + IEC 60079 + NEC Art. 500–505

Open scenario →
Scenario 08 Semiconductor Fab Tool (Etch / CVD)

Start: SEMI S2/S8/S14 + IEC 60204-1 + ISO 12100

Open scenario →
Scenario 09 Offshore Platform ESD / F&G

Start: DNV-OS-D201 + IEC 61511 + IEC 60079

Open scenario →
Trust Boundary — Engineering Judgment Required

This site is a personal-use paraphrase and navigation reference for industrial automation standards. It is not a substitute for authoritative standards documents, professional engineering judgment, or legal review. All content is sourced from a local RAG corpus and has not been independently verified against current published editions.

Items marked TO VERIFY have limited or unconfirmed local coverage. Items marked NOT IN CORPUS are not covered in the local repository. Do not rely on this site for compliance determinations, safety-critical design decisions, or legal interpretation.